New Tractor Implement ‘Parking Lot’ Update … FINISHED (for Now)

I had to move a big pile of tree trimmings out of the way, then move a few pallets of stuff aside, to clear enough space to add the second 16′ length to the implement parking lot.

Then, it was just a matter of using the new pole boom implement to lift and ‘park’ all the implements that were scattered all over the place.  Every time I pick up and move something as heavy and/or cumbersome as the PTO chipper/shredder (below), the boom pays for itself.  😉

Finally got all the equipment moved to ‘parking.’  Already filled all 32 feet of parking space … so I’ll have to extend it at some point in the future, because I still have a few implements I plan to purchase.

Hmmm, maybe I can figure out a way to design a double-decker parking structure and use the pallet forks to ‘park’ implements on the upper deck.  Sounds like an interesting engineering challenge …